VB 100 standard boxes at 4 meters depth.
The complete element is placed into the trench.
VB 100 standard boxes.
pre excavating to place the next element.
The base element is set into the trench.
A very small trench is possible with these standard boxes.
Top view at 4 meter below ground level.